What Clients Say
British Waterways were very pleased with the bear trap gate manufactured and installed by Laurasia Engineering Limited at the Tees White Water Course. The gate was manufactured to specification, delivered on time, and installed as per the project schedule. British Waterways would be happy to consider Laurasia Engineering Limited for future projects of this type.
Darren Martin
Principal Electrical EngineerBritish Waterways
Scottish Canals were entirely satisfied with the central rail anchor system manufactured and installed by Laurasia Engineering Limited at the Falkirk Wheel Boatlift, Falkirk. The Falkirk Wheel is a unique structure and as such presented unique engineering challenges. The rail sets and central anchor design are unique in that they are fitted to a rotating structure and support two water-filled gondolas which travel over the circular rail sets with a radius of 4400mm. The anchor materials were manufactured on time and to specification. During installation issues outside Laurasia Engineering Limited's work scope presented challenges and potential delays. Laurasia Engineering Limited's actions working with both client and designers,ensured that potential impact on program of these engineering changes was minimised. To this effect the project was completed early and to specification. Scottish Canals would be happy to consider Laurasia Engineering Limited for future projects.
Stephen Berry
Principal Mechanical and Electrical EngineerScottish Canals
Our thanks to Laurasia staff on another successful job [The modification to type 57 Locomotive of A-frames and couplers]
Clive Davis
Principle EngineerBrush Traction
Laurasia Engineering Limited has supplied Bauer with high quality bespoke equipment including piling installation and removal tools. Many of these tools have been used in high profile projects such Crossrail and the construction of Principle Place, London. Mayflower’s greatest strengths are their technical expertise and their ability to deliver full projects on time, from initial concept to detail design, manufacture and delivery
Gustav Jahnert
Project ManagerBauer Technologies Limited

